Sanitary sewer lives or dies on grade. We install gravity mains, manholes, and service laterals with the precision needed to pass inspection and perform for decades.
SECTION / SSLAYER 03
SS / +00
IMAGE / Sewer pipe being set on grade / manhole installIMG-SS
SCOPE / SS
What's included
- SS-01Gravity sewer main installation
- SS-02Manholes and cleanouts
- SS-03Service laterals to each lot
- SS-04Connections to existing sewer
- SS-05Line testing and inspection coordination
[ CLIENT INPUT ]
Confirm this scope list with YR — strike anything they don't self-perform.
SEQUENCE / SS
How it goes in
- STEP / 01
Layout
Survey stakes, grades, and alignment verified before we dig.
- STEP / 02
Install
Excavate, bed, and lay pipe on grade; set manholes.
- STEP / 03
Test
Coordinate required testing and inspections.
- STEP / 04
Backfill
Backfill and compact in lifts to spec.