Domestic Water

We install the water systems that serve new homes and developments — from the main in the street to the service at each lot — built to the standards of the local water utility.

SECTION / WLAYER 02
EG / EXISTING GROUNDINLETSD-MHSS-MH1SS-MH2FG / FINISHED GRADE ±0.00GVFHW / DOMESTIC WATERPRESSURESD / STORM SEWERSS / SANITARY SEWER› GRAVITY FLOW · NOT TO SCALE
W / +00
IMAGE / Crew installing water main in a trenchIMG-W

SCOPE / W

What's included

  • W-01Water main installation
  • W-02Water service lines and meter boxes
  • W-03Gate valves and fittings
  • W-04Fire hydrant assemblies
  • W-05Tie-ins to existing mains
  • W-06Pressure testing and disinfection coordination

[ CLIENT INPUT ]

Confirm this scope list with YR — strike anything they don't self-perform.

SEQUENCE / W

How it goes in

  1. STEP / 01

    Coordinate

    Confirm plans, materials, and inspections with the utility and GC.

  2. STEP / 02

    Trench & lay

    Excavate, bed, and install pipe, valves, and hydrants.

  3. STEP / 03

    Test

    Pressure test and coordinate disinfection and sampling.

  4. STEP / 04

    Backfill & restore

    Backfill, compact, and leave the site ready for paving.